CIRQUE DU SOLEI - COOLING SOLUTION

Desatrous design giving 16 weeks before promised shipping terrible thermal result by final testing. This high power LED beamer 2400W follows the artists in 3D movements in real time. Low weight and high cooling result is needed. The project is on risk - a fast, powerfull solution is needed.

start + 1 week
Sharing all needed data, existing mechanical data, measured temperatures, measured power consumption, starting with first ideas

in 2nd week 
possible solutions (3 versions) have been simulated by ADEO, and the best solution "theoretically" validated

in 3th week
starting prototyping (express orders, with clearance by costumer) 

in 5th week 
shipped out prototypes, 12 units made without tools 

in 7th week
costumer gives clearance for production, 500 pieces are asap needed. Including production of 4 tools for alu sheet punching (fins), and aluminium extrusion tool for the baseplate.

in 11th week
delivery of 500 pieces by air freight 

after 16 weeks
cirque to solei starts his new show in Canada. Running a LED light show with ADEO Cooling heatpipe system.

ADEO SUCCESFUL STORIES

ADEO SUCCESFUL STORIES

ADEO SUCCESFUL STORIES

ADEOSUCCESFUL STORIES

ADEO HEATPIPE LOGO
ADEO HEATPIPE LTD
UNIT 2201, 22F PROSPER COMM
BILDG 9 YIN CHONG ST MONGKOK KLN
HONG KONG
WWW.ADEO-HEATPIPE.COM
HOME   CONTACT   SITEMAP   LEGAL INFO  
© 2015 - 2017 ADEO HEATPIPE LTD - Alle Rechte vorbehalten .